![hoist crane lift hoist crane lift](http://www.overheadlifting.org/wp-content/uploads/2019/12/MHI0111-OABLOG-HOISTS-750x375-1.jpg)
![hoist crane lift hoist crane lift](https://secure.img1-fg.wfcdn.com/im/91989256/resize-h755-w755^compr-r85/1559/155974521/1800+LB+Electric+Wire+Hoist+Winch+Hoist+-Crane+Lift+110V+40+Ft+W%2F+Remote+Contro.jpg)
(b) used as a work platform or used for hoisting loads or accessing a work location (a) capable of acting as a crane and as an aerial ladder, and "load bearing component" means any component that transfers load through a crane or hoist to the surface supporting the crane or hoist (b) the use of a crane with an electromagnet or grapple for the handling of scrap metal and other similar materials (a) the use of a crane to do dragline work, clamshell work, dynamic compaction work or pile driving work, including pile extraction using a vibratory pile extraction device, or (h) a lift of a load over or between energized high voltage electrical conductors, or (g) a lift by a crane, boom truck or hoist, supported on a floating base, that exceeds 90% of rated capacity for the lifting system, (f) a lift in which the length of one or more sling legs changes during a lift, (e) a lift in which the centre of gravity of the load changes during the lift, (d) a lift of a person in a work platform suspended from or attached to a crane or hoist, (c) a tandem lift involving the simultaneous use of more than two cranes, hoists or other pieces of powered lifting equipment, (b) a tandem lift if the load on any one crane, hoist or other piece of powered lifting equipment exceeds 75% of the rated capacity of that crane, hoist or other piece of powered lifting equipment, (a) a lift by a mobile crane or boom truck that exceeds 90% of its rated capacity while it is lifting the load at a load radius of more than 50% of its maximum permitted load radius, taking into account its position and configuration during the lift, "construction material hoist" means a material hoist consisting of a guiding and supporting structure and hoist equipment that is not a permanent part of a building, structure, or other work and that is installed and used during construction, alteration, or demolition to raise and lower materials required for the project
![hoist crane lift hoist crane lift](https://5.imimg.com/data5/LD/NN/MY-2571740/monkey-hoist-lift-machine-500x500.jpg)
"chimney hoist" means a temporary hoist used for transporting personnel or materials during the construction of a chimney or similar structure Schedule 14-A WorkSafeBC Standard 14.116 - Chimney Hoists Cranes and Hoists Definitions and Application Forestry Operations and Similar Activitiesġ4.8 Boom extension and load radius indicatorsġ4.16.1 Certification following misadventureġ4.33 Fire extinguisher EQUIPMENT OPERATIONġ4.49.1 Communication between equipment operatorsġ4.53 High voltage electrical conductors BRIDGE, GANTRY AND OVERHEAD TRAVELLING CRANESġ4.58 Direction markings PNEUMATICALLY POWERED HOISTS AND WINCHESġ4.60 Electric hoists MANUALLY POWERED HOISTSġ4.62 Crank handles MOBILE CRANES, BOOM TRUCKS AND SIGN TRUCKSġ4.65 Cranes on floating supports ġ4.94 Counter jib MISCELLANEOUS MATERIAL HOISTSġ4.95 Standards CONSTRUCTION MATERIAL HOISTSġ4.106 Travel and load limit switches ġ4.107 Erection and maintenance ġ4.108 Operator qualifications ġ4.109 Operator responsibilities ġ4.111 Testing safety and control devices ġ4.131 Operator qualifications ġ4.132 Unattended controls SCHEDULE 14-A Diving, Fishing and Other Marine Operations Ladders, Scaffolds and Temporary Work Platforms Personal Protective Clothing and Equipment Noise, Vibration, Radiation and Temperature Occupational Health and Safety Regulation